KCP&L East Crossroads Art Wall Update

As an update to our last post we’ve installed the full size art wall mock-up on site at the corner of 19th and Cherry (KCP&L Crosstown Sub Station).  If you are in town feel free to visit and experience the scale of the project in context.  The majority of the block will be wrapped with our steel panel system…approximately 1000 feet.  The temporary lighting installation should be on site later this week…we’ll keep you posted.

Just in case you are wondering, the diagonal bracing flanking both sides of the mock-up will NOT exist in the final design, this is a temporary fix for a minor logistical issue…they always seem to pop up at the most inopportune times.