East Village Apartments designed by Pendulum Studio wins EDC residential Cornerstone Award

east_village__0005

east_village__0048

east_village__0070

east_village__0092

east_village__0095

Project Team

  • Pendulum Studio, Designer/Architect of Record
  • Structural Engineer, Dubois Consultants Inc.
  • MEP Engineer, BGR Consulting Engineers
  • Photographer, Iiams Images

Time Warner Cable Field Opening Day Update

FoxCitiesStadium240dpi

Although it was a cold and rainy day in early April 2013, the formal reveal of the ballpark renovation effort was warmly received by the public.  After ten years of talking, sketching, brainstorming, 3D modeling, and tearing through rolls of trace paper, the vision of a new Time Warner Cable Field as seen through the eyes of Team President and General Manager Rob Zerjav was finally realized; and in our opinion it was worth the long wait.

pano_2

Pendulum Studio was tasked with designing a renovated facility that would not only compete in the current marketplace but also look toward the future and answer the question…”where is the market going?”  We believe the answer to that question is different for every market based on a number of complex variables, i.e. size of market, existing amenities and infrastructure, and financing options.  However, at the root of the issue at Time Warner Cable Field was first resolving the basic need to increase fundamental front office infrastructure that included new administrative offices, team store, doubling the capacity of fan toilets and concessions.

The remainder of the allocated budget was focused on enhanced curb appeal/street presence and increased premium amenities for year-round use.  The series of images below focus on the premium club addition located above the existing main concourse behind home plate.  The newly constructed 10,000 square foot program includes the following:

  • VIP lobby & elevator
  • Banquet space to accommodate 250 patrons
  • Premium bar
  • Club lounge overlooking the new main entry
  • Six premium suites
  • Outdoor banquet seating
  • Integrated AV system for weddings and corporate functions
  • Full service banquet kitchen and prep area
  • Banquet storage
  • Executive wash rooms

banquet

suite_3

suite_tub

Stay tuned for final images…once it stops raining and snowing in Wisconsin.  We’ll be posting a complete walking tour of the facilities last spring/early summer.

Athletic Park Renovation – Wausau, WI

AP_Wausau_Aerial View

On April 17, 2013 a press conference was held in Wausau, WI to announce phased renovations to Historic Athletic Park.  The ballpark was originally constructed around 1912 and has been updated with minor renovations over the last twenty years.  The current planned improvements will be the first major renovation in the parks long history and will contribute to a long future for the Wisconsin Woodchucks in the Wausau market.  Pendulum Studio was retained by the team owner, Mark Macdonald for their pro forma based design approach and expertise in seating inventory, fan comfort, and revenue generating ideas.AP_Wausau_Front View

Phase one of the project will focus on a total reconstruction of the seating bowl behind home plate,  a new street facing facade with curb appeal, and the preservation of the existing historic granite perimeter wall.  In contrast to the current cramped bench seating that consists of line-of-sight obstructed views to the playing field surface, the new design will provide more spacious rows equipped with fixed armchair seats.  Dugout club group seating will also be provided at field level.

AP_Wausau_Field View

In the planned future phases additional concessions points of sale, toilet accommodations and roof top decks will target increased mid-priced group and corporate amenities.

Although the project is small in scale, patrons that visit the newly renovated ballpark can expect large-scale improvements in fan comfort.  Pendulum’s initial design process involved attending games and talking with fans about their current game-day experience.  We tossed around  design ideas amongst patrons of all ages, then applied the feedback to a series of sketches and 3D models that were simultaneously input into a pro forma to balance investment cost in consideration of long and short-term revenue potential.  Time will tell how successful our design process will prove to be in this particular application, however we have great expectations for the future.

RW/2 & The Guild Update

It’s been a while since we’ve posted progress pictures of one of our favorite local projects located at 1621 Locust in the East Crossroads District.  Although the building has been occupied since October of 2012 we’re still working with Egg Design and the Wade Brothers to make things perfect prior to our big reveal in the form of professional photography.  If you haven’t attended an event at the Guild yet you should definitely do so.  The decor is classic 1920’s with a splash of mod here and there.  The vibe is always right with an emphasis on live music, great craft drinks at the bar, and upscale culinary bites by local emerging  chefs.

C:UsersAdministratorDocuments1621 Locust.pdf

Guild Main Entry

Guild Door

Event Feature Lighting

Event Space

Guild Bar

Accent Light

Men Toilet Room

Rear Entry

Studio View 2

Studio Kitchen

Studio View

Stair Detail

Architect of record: Pendulum Studio

Design, Fabrication, Style: Dale Frommelt – Egg Design

Custom Steel Fabrication/Innovation: Pascal Meya – Meya Metalworks

Pure Genius: The Wade Brothers + Real Fake

12 Days and Counting…Time Warner Cable Field Renovation

Main Entry Canopy

Things are coming together at Time Warner Cable Field.  Most of the major design elements are in place and we’re now focused on the small details.  Signage and way-finding installation is well under way.  Opening day on April 8th is going to be a night to remember.

Long-awaited plans unveiled for a new Bakersfield Blaze ballpark

BY JOHN COX Californian staff writer jcox@bakersfield.com

After months, if not years, of anticipation, Bakersfield got the good news Thursday: a new ballpark is firmly in the works. Owners of the Bakersfield Blaze unveiled plans for a privately financed, 3,500-seat stadium that would become the first-phase centerpiece of the Bakersfield Commons mixed-use development project at Coffee and Brimhall roads.  Construction is expected to begin early next year and the ballpark could open in 2014, although not necessarily by the start of the baseball season. The $20 million stadium essentially would replace the county’s aging Sam Lynn Ballpark with a family-oriented facility to be accompanied eventually by new restaurants, retail and entertainment such as a new movie theater.  “The idea of this is to be more than just a baseball field,” said Gene Voiland, a prominent local oil executive who together with Bakersfield oilman Chad Hathaway purchased the Blaze last spring.  “We are putting together an entertainment complex.”  If approved as proposed, the 15-acre project would crown decades of sometimes frustrating negotiations aimed at giving Bakersfield a new baseball stadium. It would also comprise the “anchor tenant” considered key to attracting retail tenants to the 255-acre Bakersfield Commons project.  While the stadium would present new opportunities — it is expected to become a venue for concerts and, potentially, Cal State Bakersfield baseball — it also carries financial risks for the team’s new owners. By their own estimate, the new stadium will have to draw an average of 2,500 spectators per game, or about five times the typical Blaze home game at Sam Lynn. The expectation is that the project will bring The Blaze into the black financially, the team owners said Thursday.

Amenities

The team hopes to sell advertising at the stadium and offer naming rights. There would also be up to eight executive suites, as well as lower priced seating on grassy berms, together increasing capacity by 1,500 people. The Blaze will move its offices and training facilities to the site, and roughly double its full-time staff to as many as 20 employees. Many will be assigned to develop non-baseball revenue opportunities, Blaze General Manager Elizabeth Martin indicated.  Voiland and Hathaway disclosed their plans to The Californian Thursday morning, shortly before filing for a conditional use permit with the city of Bakersfield. They predicted that the stadium’s light, noise and traffic impacts will not bother area residents or present additional hurdles to city approval of the larger Bakersfield Commons project.  Upon receiving the team’s permit request Thursday afternoon, city staff scheduled a Dec. 11 hearing before the city’s Board of Zoning Adjustments to consider what amounts to an adjustment of the project’s existing approval.  Rhonda Smiley, assistant to Bakersfield City Manager Alan Tandy, who was away from the office Thursday, said city staff are “enthused” about working with The Blaze on the stadium. “Obviously the city … has been … long interested in bringing baseball — professional baseball — to a higher level in Bakersfield, in terms of an improved stadium,” Smiley said.

Laying groundwork

Some of the stadium’s groundwork is already in place. The Blaze has signed a 20-year, renewable lease with World Oil Corp., the property’s owner and developer of the Bakersfield Commons project.  The team has also hired two separate architectural firms – Pendulum Studio, a Kansas City, Mo. based firm with experience designing sports stadiums; and Fresno’s Teter Architects & Engineers. The builder is to be Bakersfield-based Wallace & Smith General Contractors.  The project’s real estate adviser is Grubb & Ellis – ASU & Associates in Bakersfield.  How the project will be paid for is less clear. The team’s owners declined to discuss details of the necessary financing, saying only that no public money will be involved and that they are looking for local investors to help them move forward with the stadium.  World Oil representatives said they see the project as key to kick-starting Bakersfield Commons, which wouldn’t begin building about 300,000 square feet of adjacent retail and restaurant space until about the time the stadium opens. Residential and office development would follow later.  “The Blaze stadium is the perfect catalyst to get this started,” World Oil principal Robert Roth said in a written statement.  Access to the stadium would come largely from the Coffee Road exit of the Westside Parkway, which is expected to be completed in the spring of 2012. Baseball fans will find some 830 parking spaces spread over eight acres.  Ticket prices have not yet been established but are expected to vary between $9 and $11 depending on where in the stadium the seat is located. Voiland said tickets won’t cost as much as $20.  “It’s still going to be family-priced entertainment,” he said.

Time Warner Cable Field – New Suites

As the design for the new ballpark continues to evolve we are starting to get a feel for some of the new premium spaces – a bit of a departure from tradition with the furniture layout.  We believe it compliments where the premium game day is headed – less about the living room and more about community and interaction.

Time Warner Cable Field Renovation

Pendulum Studio has been selected to design the renovation of Time Warner Cable Field at Fox Cities Stadium located in Grand Chute, WI.  The ballpark was originally constructed in 1995 during an era of MiLB ballparks geared primarily toward compliance with minimum National Association (NA) facility standards.   Although this strategy provided a safe and comfortable destination for enjoying America’s favorite pastime, shifts in the traditional baseball business model over the past 17 years has presented quite a few challenges for most teams operating in facilities built prior to the late 90’s.  Some of the key challenges associated with maintaining a competitive edge in aged facilities are as follows:

  1. Shortage of concession points of sale
  2. Lack of appropriate toilet fixture ratios
  3. Lack of diversity in seating inventory
  4. Absence of premium amenities
  5. Limited ability to function on a year-round basis
  6. inadequate storage capacity

While the traditional  baseball business model focused on the “game”, the new in minor league baseball is centered around maximizing fan comfort and family entertainment.  Although “the game” is still the vehicle for attracting patrons to the front gates, “the show” between innings on the field, during the game in the stands and on the concourses is what keeps people (especially families) coming back for more.  Because of the popularity in this trend, new and renovated facilities are moving toward more compact lower density seating configurations that promote diversity in seating inventory (group, premium, semi-premium) versus the typical fixed armchair seating.  In the wake of the decline of corporate participation in the form of sponsorship and long-term premium suite lease agreements we now see teams trending heavily toward multi-use flex spaces in the form of meeting rooms and banquet space that can also be configured to accommodate traditional suite functions during games.  This move has enabled teams to extend facility use beyond the confines of the regular season thus also maximizing the potential for revenue which promotes economic sustainability.

Stadium Improvements

The planned improvements to Time Warner Cable Field at Fox Cities Stadium are geared toward complimenting some of the forward thinking improvements that were already completed prior to the previous season.  These improvements were instrumental in diversifying existing seating inventory  – i.e. the first & third base bullpen premium seating shown below.

This next phase of improvements will focus on relocating enclosed premium inventory from the main concourse to a newly constructed suite/banquet level, expanding administrative, retail, food service and storage capacity while increasing the ability of the facility to accommodate year-round events.  The images below illustrate the proposed look and feel of our schematic design concepts.  We will continue to update this imagery as we progress toward the final design and documentation.  It is an honor to be working with the Timber Rattlers on this exciting project.  Opening day in April 2013 is going to be special.

Five Year Anniversary

If there is one thing we’ve learned in the past five years it is that economic sustainability is key to survival.  This applies to business practice in general but in a greater sense it applies to how we approach projects as architects, designers, and collaborators in the future of the built environment.  It is clear that as key influencers in decisions related to site selection, program, building systems and materials, our ability to equip our clients with an environment that promotes long-term sustainability (environmentally and economically), is in many cases the determining factor between project success and failure.

Although we’ve always been individually business minded, I have to admit that five years ago this discussion would have been skewed more heavily toward our passion for design…and although aesthetics/outward appearances continues to be one of our many priorities, experience has taught us that real design success is often gauged by our ability to navigate the politics, the budget, and the business end of the business.

The past five years have taught us about the evolving definition of “capacity” :

1. Our client’s perception of our capacity (as in competence) to design and document the work.

2. Our clients perception of our capacity (as in the appropriate staff) to execute the work.

3. Our client’s perception of our capacity (as in financial ability) to maintain the work.

The projects below document the five-year journey from our firm’s infancy to adolescence.  Each project listed certainly contributed to our growth from the aforementioned first phase of “capacity” to the next.  We are still learning, we are still growing, but most importantly we are still in love with this profession.  We thank our clients for their confidence in our firm and look forward to what the future will bring.

Pendulum Studio Built Work 2009 – 2011

East Village Apartments

The East Village Apartment building is the first phase of a master planned ten block redevelopment of downtown Kansas City, MO.  This fifty-unit, four-story residential building was designed to complement the neighboring Power & Light Entertainment District and accommodate Kansas City metro citizens that desire to live and work within the urban core. As the master architect for the development, Pendulum Studio was instrumental in the creation of design standards and development guidelines for the Urban Redevelopment District (URD) approved by the City of Kansas City Planning and Zoning Commission.

Swope South Health Clinic

The Swope South Health Clinic is a 5,000 square foot tenant improvement of an abandoned strip mall located at 87th Street and Troost in Kansas City, MO.  The scope of the project included selective demolition of existing partitions, cooking equipment, and finishes to be replaced by exam rooms, community meeting space, and administrative offices. This project is an example of Pendulum’s ability to deliver a turn-key, fast tracked solution that included general design, interior finishes, FF&E selection and coordination, custom fabrication, and construction management.  The total scope of work was completed in four months.

The Corn Crib

The Corn Crib is a multi-purpose sports facility shared by the Normal Cornbelters, a Frontier League Independent Baseball Club, and Heartland Community College men’s and women’s athletics which includes baseball, softball, and soccer. The stadium consists of 4,500 fixed seats, twelve premium suites, four locker rooms, and a flexible artificial turf playing surface equipped with a removable pitching mound that accommodates quick changeover between events.  In addition tot he aforementioned cope, the total project cost included a soccer and softball practice field, 600 paved parking spaces, and 600 grass parking spaces. The Corn Crib is a good example of Pendulum’s ability to deliver a significant project scope with a modest budget on a fast-tracked schedule.

Rooftop Hospitality

This rooftop hospitality building is located on the uppermost floor of the Cosentino’s Market parking garage at the corner of 14th Street and Main directly adjacent to the Jones Pool.  The building program consists of four water closets, three urinals, six lavatories, a drinking fountain, and storage area. The purpose of the building is to allow the City to serve patrons that desire to eat lunch or walk and enjoy the sun during the work week.  During the evening hours and on weekends when the weather is favorable, wedding receptions and civic events can be hosted on the rooftop comfortably accommodating up to 600 patrons. Although the City required a conventional “bricks and mortar” delivery method, Pendulum learned valuable lessons from this project.  Given the right circumstances the implementation of a prefabricated “off-grid” delivery method would allow the installation of an identical building for half the budget in half the time.  Pendulum continues to study this modular approach to design that will be showcased in future projects.

On Deck…

AP23 Indoor Sports Complex – Columbus, OH

Bethany Medical Clinic – Wyandotte County, KS

Crime Lab – Kansas City, MO

KCP&L Cross Town Sub-Station

Rush Wade/2 Studio & The Guild – Kansas City, MO

Time Warner Cable Field Renovation – Appleton, WI

The Reason We Are Here

As we look optimistically toward the future and the next chapter in our story we must without question offer many thanks to the individuals that have been instrumentally supportive of our existence:

For Inspiration and Encouragement:

Dr. Donovan Case, Mrs. Carolyn Case

Mr.Jonathan Cole Sr., Mrs. Bernice Cole

For Tolerance and Understanding:

Katrina Case, Darian Case, Jasmine Case

Theresa Cole, Ethan Cole, Jordan Cole and Gianna Cole